Indoor running track at the National Sports Centre in Magglingen

Run to you

The running track – spanning approximately 1,000 m² – can be dismantled into 230 portable elements, which can then be assembled and taken down again with ease.

The small village of Magglingen in the canton of Bern is, in practice, the training camp for Swiss top-class sport, including the National Sports Centre in Magglingen (NSM).

The National Sports Centre in Magg­lingen, a faci­lity of the Swiss Federal Office of Sport, offers trai­ning faci­li­ties for almost every sport, all under compe­ti­tion condi­tions at the very highest level. Among them is a mobile indoor running track that can be set up and taken down as needed. This has now been renewed.

CONIPUR SW was chosen for the floo­ring because, on the one hand, it meets the requi­re­ments of the World Athle­tics and Swiss Athle­tics, and on the other hand it is very light.

The Swiss Federal Insti­tute of Sport in Magg­lingen (EHSM) is the only Swiss higher educa­tion faci­lity exclu­si­vely dedi­cated to teaching, rese­arch, deve­lo­p­ment and services within the disci­pline of sport. It is part of the Swiss Federal Office of Sport (BASPO), which is also based in Magg­lingen.

The small village in the canton of Bern is, in prac­tice, the trai­ning camp for Swiss top-class sport. In this capa­city, it boasts in excess of 80,000 over­night stays annu­ally. For its nume­rous guests, the univer­sity runs the National Sports Centre in Magg­lingen (NSM).

Running tracks

Conica AG
Indus­trie­strasse 26
CH — 8207 Schaff­hausen

Client

Swiss Federal Insti­tute of Sport in Magg­lingen (EHSM)

To allow runners to train in bad weather, there is an indoor running track in a hall that can be set up and taken down as required.

Under the motto “Sporting and mental excel­lence in an inspi­ring envi­ron­ment”, athletes can take advan­tage of the offers of support from sports science thanks to the services available from the EHSM, as well as optimal trai­ning faci­li­ties at one and the same loca­tion. Indoor and outdoor sports venues, as well as seminar rooms, accom­mo­da­tion and cate­ring faci­li­ties are available for this purpose.

The NSM aims to offer the right equip­ment for prac­ti­cally every type of compe­ti­tive sport. In addi­tion to exten­sive outdoor faci­li­ties, it has a five-court hall, two three-court halls, three single court halls inclu­ding a fitness and weights room, and a fencing and squash hall.

Whether for volley­ball, clim­bing or dancing, the halls offer the right envi­ron­ment for almost every sport. To allow runners to train in bad weather, there is an indoor running track in a hall that can be set up and taken down as required.

This was to be comple­tely renewed. The new design should, of course, continue to meet all the demands of compe­ti­tive sport, i.e. a high-quality surface and bend eleva­tions of around one metre. The floo­ring must ther­e­fore, on the one hand, meet the requi­re­ments of World Athle­tics and Swiss Athle­tics and, on the other, weigh as little as possible – an ideal appli­ca­tion for CONIPUR SW.

The 13 mm-thick poly­ure­thane running track system with a PUR-bonded elastic layer compri­sing recy­cled rubber granules incor­po­rates both high quality and dura­bi­lity due to its 3 mm PUR top layer and is a great alter­na­tive to all-plastic floo­ring options. CONIPUR SW is easy on the joints and slip-resistant.

For use in the hall, the impact-sound insu­la­tion is also an advan­tage.

Besides its tech­nical proper­ties, the CONI­CA/­CO­NIPUR-Indoor Running Track was also able to host a convin­cing perfor­mance for the Federal Office when used in Prague. The contract for the instal­la­tion was awarded to Walo Bert­schinger AG from Gümligen, which had only just been named one of the “Best Employers in 2020” in Switz­er­land in February 2020.

Physical address

Eidge­nös­si­sche Hoch­schule für Sport Magg­lingen
Haupt­strasse 247
CH — 2532 Magg­lingen

Opening

2022

The running track – spanning approximately 1,000 m² – can be dismantled into 230 portable elements, which can then be assembled and taken down again with ease.

The sand­wich struc­ture proved bene­fi­cial for produc­tion. Since only a short time frame was available for the instal­la­tion at the NSM, the base­layer of the SW system was atta­ched to the wooden elements at the manu­fac­turer. The indi­vi­dual elements were then trans­ported to Magg­lingen, assem­bled on-site and coated with CONIPUR 210 blue.

The finished running track was finally sealed with CONIPUR 2200, which soli­di­fies the granu­lated surface of the floo­ring and also faci­li­tates clea­ning.

After the coating was finally cured, cutting could then begin at the joints between the indi­vi­dual elements. Coating the bends, in parti­cular, required a great deal of exper­tise, as these were set at compe­ti­tion level during proces­sing and had a corre­spon­dingly steep gradient. If this is not done carefully, the mate­rial can flow off.

However, the plan­ning proved to be successful. The running track – span­ning appro­xi­m­ately 1,000 m² – can be dismantled into 230 portable elements, which can then be assem­bled and taken down again with ease.

With it, the NSM can now offer optimal trai­ning options for indoor running under compe­ti­tive condi­tions.