What is parti­cu­larly impres­sive is that the damaged areas were repaired in less than three days during the fall vaca­tions. The Volta­platz skate park did not even have to be closed.

Meeting point Skate­park Volta­platz

The Volta­platz skate park in Krefeld has been a central meeting point for skate­boar­ders, BMX riders and inline skaters since it opened in the 1990s. Two quar­ters, two kickers, a spine, two curbs, an Ollibox and a rail are available for the athletes. The park also has a soccer pitch and a street hockey pitch.

However, the inten­sive use of the faci­lity over the years had led to considerable damage to the asphalt surface, which extended into the binding layer and endan­gered safety. In order to ensure the long-term usabi­lity of the park, Kommu­nal­be­trieb Krefeld ther­e­fore decided to repair the damaged areas.

The fixed requi­re­ments were that the disrup­tion to use should be as low as possible and that the track should be usable again as quickly as possible.

In order to meet these strict speci­fi­ca­tions, the repairs were carried out using products from the Minden-based liquid plastic specia­list Triflex.

Three days in the fall

The work at the Volta­platz skate park took place during the 2024 autumn vaca­tions while the park was in opera­tion in order to mini­mize disrup­tion to users.

The surface first had to be thoroughly prepared for the repair. The damaged areas in the asphalt were carefully chiseled out and then cleaned. After clea­ning, the areas were primed (with Triflex Cryl Primer 222) to ensure an optimum bond between the substrate and the repair mortar.

Once the primer had hardened, the repair mortar Triflex Asphalt Repro 3K was applied. This three-compo­nent, bitumen-free repair mortar enables fast and durable repairs. The product is ideally suited for the long-term repair of damaged areas on roads, paths and in parks with little effort.

Less time, less odor

Triflex Asphalt Repro 3K is applied in just a few steps: Applied cold directly from the bucket and spread with a trowel, no special equip­ment is required. The product forms a full-surface adhe­sive bond with the exis­ting asphalt substrate.

The PMMA resin contained in the repair mortar hardens very quickly, in 45 minutes.

The blocking times can ther­e­fore be reduced to a minimum. Compared to conven­tional mastic asphalt, the repair with a PMMA-based product was faster, more econo­mical and was accom­pa­nied by signi­fi­cantly less odor nuisance.

Mate­rial & tech­no­logy

The special struc­ture of the park, with its ramps and tran­si­tions between diffe­rent mate­rials such as asphalt and metal, posed a considerable addi­tional chall­enge for both the processor and the product.

Toge­ther with the Krefeld-based company Kox Abdich­tungs­technik, the some­times chal­len­ging repairs to tran­si­tion areas between asphalt and metal were also carried out with precision. The repair mortar used enables flexible and precise work without the need for heavy equip­ment. The rapid curing of the mate­rial also ensured that the freshly repaired areas could be used again quickly.

The reno­va­tion of the skate park at Volta­platz shows how the use of modern mate­rials and tech­ni­ques can extend the service life of such faci­li­ties and ensure the safety of users.

Parti­cu­larly impres­sive: the repair of the damaged areas was carried out in less than three days during the fall vaca­tions in order to reduce the disrup­tion to users to a minimum. The Volta­platz skate park did not even have to be closed.

Project data

Execu­ting company

Kox Abdich­tungs­technik
Hoch­staden Str. 5
D- 47829 Krefeld

Buil­ding owner

City of Krefeld

Refur­bish­ment

23.–25.10.2024

Manu­fac­turer

Triflex GmbH & Co. KG
Karl­straße 59
D – 32423 Minden

Product: Triflex Asphalt Repro 3K

Address

Skate­park Volta­platz
D – 47805 Krefeld

Photos

Triflex

Text

Johannes Bühl­be­cker
More Sports Media
(Adver­to­rial)

Video

Our news­letter

Your stage

Publish your project or product here!

GDPR Cookie Consent with Real Cookie Banner