The tempo­rary sports hall in Albstadt

For the tran­si­tion

 

NUSSLI

When the old sports hall has to be demo­lished but school lessons have to continue: In Albstadt, a modern tempo­rary sports hall was built in just a few months for the coming years.

A prag­matic and clever solu­tion – energy-effi­cient and future-oriented.

Genesis

The town of Albstadt in Baden-Würt­tem­berg (popu­la­tion 47,000) faced a chall­enge that will be fami­liar to many German muni­ci­pa­li­ties: What to do when dila­pi­dated school sports halls from the 1970s urgently need to be replaced and the new cons­truc­tion will take years?

The hall at Schloss­berg Real­schule had massive concrete damage and struc­tural defects that made further use impos­sible and demo­li­tion unavo­idable. So a repla­ce­ment was needed so that school and club sports would not have to take a break: the tempo­rary Albstadt sports hall.

 

The city was ther­e­fore looking for a prag­matic and func­tional interim solu­tion for the next five to ten years that could be imple­mented quickly and at the same time meet all func­tional and other requi­re­ments.

The contract was awarded to NUSSLI.

Func­tion

The tempo­rary Albstadt sports hall measures 45 x 22 meters and has a pitched roof with a ridge height of 9.5 meters. The supporting struc­ture consists of a robust steel cons­truc­tion clad with sand­wich panels. A strip light provides natural lighting.

The ancil­lary rooms were arranged on the two long sides of the hall: On the west side there are equip­ment and storage rooms, on the east side chan­ging rooms, toilets and showers, which are acces­sible via a corridor. These single-storey areas were cons­tructed using prefa­bri­cated contai­ners: They only had to be connected on site, which of course saved an enormous amount of time.

 

The decision to opt for a steel struc­ture rather than an air dome, which is cheaper to purchase, pays off in the long term: Not only is it more durable, it also incurs signi­fi­cantly lower opera­ting costs – a decisive advan­tage, espe­ci­ally given the current energy prices.

The tempo­rary Albstadt sports hall can be divided into three equally sized areas with the help of parti­tion curtains. The sports floor has floor sockets for sports equip­ment, basket­ball hoops and a fold-out wall bars.

Ever­y­thing you need for modern school and club sports.

Blue­print

Thanks to its modular cons­truc­tion, the tempo­rary sports hall in Albstadt was erected and put into opera­tion in just six months.

The project is an example of how prag­matic solu­tions can over­come muni­cipal chal­lenges: With the tempo­rary sports hall in Albstadt, the city is bridging the time until a new buil­ding is cons­tructed without pupils or sports clubs having to give up their trai­ning faci­li­ties. The well thought-out design combines cost-effec­ti­ve­ness with func­tion­a­lity – a blue­print for other cities with similar problems.

Project data

Desi­gner

NUSSLI Group

Buil­ding owner

City of Albstadt

Users

Schloss­berg secon­dary school

Opening

2023

Address

Schloss­berg-Real­schule
Hohen­zol­lern­straße 6
D – 72458 Albstadt

Photos

NUSSLI

Text

Johannes Bühl­be­cker
More Sports Media
(Adver­to­rial)

Video

Our news­letter

Your stage

Publish your project or product here!

GDPR Cookie Consent with Real Cookie Banner