Three rings for Milan
Arena Milano (Unipol Dome)
Architecture
Uses
Sport, concerts and cultural events
Client
Features
- Elliptical building with three horizontal façade rings
- Aluminium façade with integrated lighting
- Long-span steel structure
- Elevated public piazza covering more than 10,000 m²
- Up to 16,000 places for sports and cultural events
- Rooftop photovoltaic system
Address
Arena Milano
Via Romualdo Bonfadini 148
I-20138 Milano
Opening
2026
Photography
Words
Johannes Bühlbecker
More Sports Media
Room for 16,000 people, three shimmering façade rings and a piazza that can become a stage in its own right. With Arena Milano (Unipol Dome), Arup and David Chipperfield Architects have given Santa Giulia a new venue for sport, concerts and major events. The 2026 Winter Olympics were its first major test. Its real work begins afterwards.
An arena for a new district
More than an events venue
Milano Santa Giulia is one of the largest urban development areas in south-eastern Milan. The arena occupies the southern part of the site and is intended to give the growing district a public focal point as well as drawing crowds to events.
The design by Arup and David Chipperfield Architects draws on the elliptical plan of the ancient Roman amphitheatre. A broad stairway from the west leads to a raised plinth that covers almost the entire site. It opens onto a piazza of more than 10,000 m², which serves as a forecourt for major events and can also be used independently of the arena.
The steps, landscaped areas and trees help connect the large building with the new district. That matters for an arena where visitor numbers rise sharply on event days. The public space needs to work even when the venue is closed.
Three rings, one arena
Architecture that can be seen from afar
Three horizontal façade rings encircle the elliptical building. They project by different amounts and are staggered upwards. Their metallic surfaces reflect daylight, while integrated lighting changes the building’s appearance after dark.
The rings break up the mass of the building and give it a clear silhouette. The continuous bands make the arena recognisable from a distance and reinterpret the historic amphitheatre as a contemporary events venue.
A large steel structure spans the interior. The roof, cantilevered façade elements and technical infrastructure place considerable demands on the structure and its coordination. The result is a simple exterior form housing a complex structure.
Firmenbeitrag
1,578 seats that can make way
CETA
CETA supplied five retractable stands with a combined capacity of 1,578 seats. Three straight units are motorised, while two curved stands are operated manually and follow the geometry of the arena.
When the venue changes from sports to a show, the stands can be retracted to free up part of the floor. CETA also supplied the custom metal safety railings.
Image source: CETA. Permission to publish on MSMA is pending.
Firmenbeitrag
From ice hockey to concerts
Designing for flexibility
The arena was designed to host the ice hockey competitions at the 2026 Winter Olympics. Its long-term programme goes much further, with concerts, shows, festivals and sports events.
The venue accommodates up to 16,000 people, with 12,000 seated and 4,000 standing. The stands, event floor and ancillary spaces have to support different formats, each with its own requirements for stage technology, deliveries and crowd movement.
For an arena built for a single major event, the central question of sustainability is how it operates afterwards. The Olympics were always intended as one stage in the building’s life.
A stage for the city
The piazza and its prospects
The raised piazza gives the arena an outdoor public space large enough to host events of its own. Alongside ticketed events indoors, it offers a second use that connects the building to the surrounding public realm.
The urban ambitions will be tested in everyday use. An arena of this size depends on good transport connections, safe crowd movement and a varied programme. Whether the piazza becomes an established public space will depend on how easily people can reach it and what they can do there.
By bringing an events venue and a public forecourt together, Arena Milano can be part of the district even when nobody is playing, singing or cheering inside.
Lessons learned
- A large arena can strengthen a new district if its outdoor spaces are usable between events.
- Repeated horizontal elements can give a large building a distinctive and coherent form.
- The long-term use of an Olympic venue belongs in the original design brief.
- Public outdoor spaces give an arena a wider role and require careful planning for access and maintenance.
Plans












